The installation engineering part is produced on site. Partition production is usually completed by a design company in its own factory. According to the measurement data and the construction structure of the site, the design drawings shall be issued by the construction party, and the two parties shall confirm to enter the next step without any doubt.Ģ. Before the renovation, the on-site measurement must be performed. In short, these ills are extremely detrimental to the cleanliness and sterile disinfection of clean aseptic plants.ġ.
ACCORDION WALL DIVIDER WINDOWS
Many installations of partitions will have some drawbacks, including: the aluminum alloy observation window on both sides of the partition is still exposed window sill Door and window hit with the thickness of the two partitions are inconsistent with the existence of dead ends doors and windows themselves gaps, many overcast angles partition plate stitching with the traditional cover-stitch approach, increased the seams and so on.
Among them, the density double-sided plasterboard partition and the clip core color steel partition are currently being promoted and applied in clean aseptic plants, and have achieved certain results for the cleanliness of the indoor environment.įor these two types of dividers, the use of matching door and window materials, node design, and construction and installation must be further improved. The acoustic room dividers are beautiful, light, high-strength, heat insulation, sound insulation, fire-retardant, moisture-proof, anti-static, smooth surface, easy cleaning, strong combination, easy construction and so on.